McNally, Pat; Heavey, Cathal
McNally
A multi-agent system for the integration of process planning and scheduling using operation-based time-extended negotiation protocols [0.03%]
一种基于作业的时间扩展协商协议的多智能体系统,用于集成工艺规划与调度
Zattar, Izabel Cristina; Ferreira, João Carlos E.; Rodrigues et al.
Zattar et al.
Sirinaovakul, Booncharoen
Sirinaovakul
Chaari, Tarek; Chaabane, Sondes; Loukil et al.
Chaari et al.
Rabelo, Luis; Sarmiento, Alfonso T.; Helal et al.
Rabelo et al.
A model for linking shop floor improvements to manufacturing cost and profitability [0.03%]
一种将车间改进与制造成本和盈利能力相联系的模型
Sundkvist, Robin; Hedman, Richard; Almström et al.
Sundkvist et al.