Proceedings of the Institution of Civil Engineers - Transport. 2001;147(4):263-265. doi: 10.1680/tran.2001.147.4.263 Q31.22025
Discussion: Predicted cost escalations in competitively bid highway projects
DOI: 10.1680/tran.2001.147.4.263
摘要
Proceedings of the Institution of Civil Engineers - Transport. 2001;147(4):263-265. doi: 10.1680/tran.2001.147.4.263 Q31.22025
DOI: 10.1680/tran.2001.147.4.263
摘要