Journal of Architectural Engineering. 2010;16(2):80-83. doi: 10.1061/(asce)1076-0431(2010)16:2(80) Q31.52025
Causes of Delay in the Planning and Design Phases for Construction Projects
DOI: 10.1061/(asce)1076-0431(2010)16:2(80)
摘要 查看摘要
Journal of Architectural Engineering. 2010;16(2):80-83. doi: 10.1061/(asce)1076-0431(2010)16:2(80) Q31.52025
DOI: 10.1061/(asce)1076-0431(2010)16:2(80)
摘要 查看摘要