The Engineering Economist. 2009;54(4):267-297. doi: 10.1080/00137910903338545 Q41.22025
Prioritizing Project Selection
优先考虑项目选择
DOI: 10.1080/00137910903338545
摘要 查看摘要
The Engineering Economist. 2009;54(4):267-297. doi: 10.1080/00137910903338545 Q41.22025
DOI: 10.1080/00137910903338545
摘要 查看摘要