International Journal of Computer Integrated Manufacturing. 2004;17(8):733-749. doi: 10.1080/0951192042000237537 Q24.02025
A rule-based heuristic finite capacity scheduling system for semiconductor backend assembly
一种基于规则的启发式有限能力半导体后端组装排程系统
DOI: 10.1080/0951192042000237537
摘要 查看摘要
