The Engineering Economist. 1998;43(2):125-150. doi: 10.1080/00137919808903193 Q41.22025
Capital Budgeting Decisions With Fuzzy Projects
基于模糊项目的资本预算决策
DOI: 10.1080/00137919808903193
摘要 查看摘要
The Engineering Economist. 1998;43(2):125-150. doi: 10.1080/00137919808903193 Q41.22025
DOI: 10.1080/00137919808903193
摘要 查看摘要