Engineering economist. 2005;50(4):337-359. doi: 10.1080/00137910500348400 Q41.22025
Project Valuation With Time-Varying Cash Flows: A Bayesian Approach
时变现金流下的项目估值:贝叶斯方法
DOI: 10.1080/00137910500348400
摘要 查看摘要
Engineering economist. 2005;50(4):337-359. doi: 10.1080/00137910500348400 Q41.22025
DOI: 10.1080/00137910500348400
摘要 查看摘要